Smart Microgrid Business

Sichuan Fen'an Aluminum Industry Distributed Microgrid EPC General Contracting Project
Project Nature: PC General Contracting
Voltage Level: 10kV
Project Overview
Sichuan Fenan Aluminum Industry Co., Ltd. is located in Lezhi County, Ziyang City. The park is under construction and is expected to be put into operation in the first half of 2025. The project plans to build a distributed photovoltaic power station using the roofs of workshops 2 and 3 in the park. It is expected to install a total of 17,324 620Wp photovoltaic modules, 26 320kW inverters, with a total DC-side capacity of 10.74MWp and a total AC-side capacity of 8.32MW.
After completion, the project will generate approximately 8.744 million kWh of electricity annually, reducing carbon emissions by 3276 tons. It will provide clean energy support for Fenan Aluminum Industry, reduce electricity costs, and help the company achieve a green and low-carbon transformation.
Project Nature: PC General Contracting
Voltage Level: 10kV
Project Overview
Sichuan Fenan Aluminum Industry Co., Ltd. is located in Lezhi County, Ziyang City. The park is under construction and is expected to be put into operation in the first half of 2025. The project plans to build a distributed photovoltaic power station using the roofs of workshops 2 and 3 in the park. It is expected to install a total of 17,324 620Wp photovoltaic modules, 26 320kW inverters, with a total DC-side capacity of 10.74MWp and a total AC-side capacity of 8.32MW. After completion, the project will generate approximately 8.744 million kWh of electricity annually, reducing carbon emissions by 3276 tons. It will provide clean energy support for Fenan Aluminum Industry, reduce electricity costs, and help the company achieve a green and low-carbon transformation.Smart Microgrid Business

Shantou-Zhanjiang Expressway East Section Distributed Photovoltaic Project
Project Overview
Encouraged by national and local policies, and leveraging TSEET's own transportation resources, we are launching a "Photovoltaic + Transportation" project, starting with distributed photovoltaics. The Guangdong Shanzhan Expressway distributed photovoltaic project deeply explores land resources along the expressway, widely installing photovoltaic components on roadside slopes, toll stations, ramp circles, service areas, and building rooftops to provide clean and green electricity for various service facilities along the expressway. The project adopts a "self-generation and self-use, surplus power grid-connected" model, with a planned total installed capacity of 34.4MW. Construction is divided into four sections, with TSEET New Energy having already completed the first section, "Jieyang Puning Section", with a total installed capacity of 7MW.
Project Overview
Encouraged by national and local policies, and leveraging TSEET's own transportation resources, we are launching a "Photovoltaic + Transportation" project, starting with distributed photovoltaics. The Guangdong Shanzhan Expressway distributed photovoltaic project deeply explores land resources along the expressway, widely installing photovoltaic components on roadside slopes, toll stations, ramp circles, service areas, and building rooftops to provide clean and green electricity for various service facilities along the expressway. The project adopts a "self-generation and self-use, surplus power grid-connected" model, with a planned total installed capacity of 34.4MW. Construction is divided into four sections, with TSEET New Energy having already completed the first section, "Jieyang Puning Section", with a total installed capacity of 7MW.Smart Microgrid Business

Jingrong Digital Economy Industrial Park Rooftop Distributed Photovoltaic Project
Project Nature: EPC General Contracting
Voltage Level: 10kV
Project Overview
The Jingrong Digital Economy Industrial Park Rooftop Distributed Photovoltaic Project is the first smart microgrid demonstration project in Longquanyi District, Chengdu City. This project is invested by Chengdu TSEET New Energy Co., Ltd. and EPC constructed by Chengdu TSEET Electric Engineering Co., Ltd. The project has a total designed photovoltaic capacity of 1754.595 kW, constructed in two phases, and adopts a self-generation and self-use, surplus power to the grid model. The first phase of photovoltaic construction has an operating capacity of 488.31 kW and an energy storage capacity of 100 kW/233 kWh.
Project Nature: EPC General Contracting
Voltage Level: 10kV
Project Overview
The Jingrong Digital Economy Industrial Park Rooftop Distributed Photovoltaic Project is the first smart microgrid demonstration project in Longquanyi District, Chengdu City. This project is invested by Chengdu TSEET New Energy Co., Ltd. and EPC constructed by Chengdu TSEET Electric Engineering Co., Ltd. The project has a total designed photovoltaic capacity of 1754.595 kW, constructed in two phases, and adopts a self-generation and self-use, surplus power to the grid model. The first phase of photovoltaic construction has an operating capacity of 488.31 kW and an energy storage capacity of 100 kW/233 kWh.Smart Microgrid Business

Green energy integrated utilization construction project
Project Nature: PC General Contracting
Voltage Level: 10kV
Project Overview
The project's photovoltaic design has a total capacity of 251.4kWP. It uses high-efficiency components from JA Solar or LONGi Green Energy (efficiency ≥20%), with a first-year degradation rate ≤2% and a total degradation rate ≤16% over 25 years; string inverters with maximum efficiency ≥98%, supporting reactive power compensation and high/low voltage ride-through functions to ensure grid compatibility. An integrated data server monitors power generation efficiency and equipment status in real-time; a failure protection device is included, storing fault data for over 10 years and supporting both local and remote retrieval.
After completion, the project is expected to generate 191,800 kWh annually, reducing carbon emissions by 71.9 tons. It will provide green power support to the Minsheng Bank Credit Card Center, contributing to the achievement of "dual carbon" goals and establishing a benchmark for urban distributed photovoltaic projects.
Project Nature: PC General Contracting
Voltage Level: 10kV
Project Overview
The project's photovoltaic design has a total capacity of 251.4kWP. It uses high-efficiency components from JA Solar or LONGi Green Energy (efficiency ≥20%), with a first-year degradation rate ≤2% and a total degradation rate ≤16% over 25 years; string inverters with maximum efficiency ≥98%, supporting reactive power compensation and high/low voltage ride-through functions to ensure grid compatibility. An integrated data server monitors power generation efficiency and equipment status in real-time; a failure protection device is included, storing fault data for over 10 years and supporting both local and remote retrieval. After completion, the project is expected to generate 191,800 kWh annually, reducing carbon emissions by 71.9 tons. It will provide green power support to the Minsheng Bank Credit Card Center, contributing to the achievement of "dual carbon" goals and establishing a benchmark for urban distributed photovoltaic projects.